Therefore, beam and joist spans must be limited and more blocks must be used over typical construction. One interesting system is a pin footing by Diamond Pier®. Measure the level of the cord with a bubble level. Type 1 has a 11/16" hole pre-drilled in the center. After your pier blocks are properly set, allow the concrete to harden (this can take anywhere from two to 24 hours). By clicking GO!, you acknowledge that you have read Trex's Privacy Policy. Therefore, beam and joist spans must be limited and more blocks must be used over typical construction. For lateral forces, like a post getting hit with a lawn mower, we don’t want the post kicked out. To get the tops of the blocks level shims made up of sections of paving slab or … In this video, I cover the basics of how to build a post and Pier foundation for a deck or a tiny home. The pier will be held firmly in place to prevent frost heave and damage to your deck. But then yesterday we stumbled upon a product at the hardware store that seems like it’s pretty environment-and-budget friendly…The Dek-Block piers are a “floating” foundation system for building decks. We only use high-quality pressure treated materials, and the subfloor material comprises high-quality plywood. Tape a cord to the top of the first pier on the first column and extend it to the top of the last pier in the column. Why We Chose Concrete Piers. Then 4" of 3/4" rock, compacted and leveled. Pull a nylon string from each block corner and make sure they are square and in line with each other. Add the next section to the frame and butt the corners together tightly. Insert the bolt end of the bracket and place the beam into the brackets. (a) Frame piers less than 36 inches high. Copyright © 2020 Trex Company, Inc. All rights reserved. Home Depot has a worksheet for calculating deck materials for supporting a shed. Most deck builders use a concrete-filled hole as the footing, but other options exist. But instead of using flat blocks, a series of precast concrete pier blocks are used to support the shed’s floor frame. We’ve been dreaming of a patio for outdoor entertaining for quite some time, but the cost and materials have been a bit overwhelming. To level the beam, tighten or loosen the nut. Know what your local area requires before starting your build. I am planning to extend my deck, which uses pier blocks as below photo. Prime the wood and paint it before you install. How to Build a Deck on Sloped or Uneven Ground. Waxed fiber tubes, readily available at home improvement centers and lumberyards, make forming and pouring footings and piers a relatively easy job. Pier blocks under a platform deck with images using pier blocks for deck building mycoffeepot org how to build a shed foundation with deck blocks what to use backfill around the concrete pier block home tips to help you build a floating deck using pier blocks for deck building mycoffeepot org. The concrete blocks are laid one on top another and bonded together with mortar so that they cannot shift. The choice to use concrete was not an easy one for me. Continue to add sections until the deck is finished. Where the pier touches the ground is where it remains damp and damage the wood. Dec 14, 2019 - Explore Adam Marshall's board "Pier blocks" on Pinterest. A 12-by-8 foot freestanding deck requires no sawing or hammering with a simple ladder frame and pier blocks. With the holes ready, place the square concrete blocks in the holes. First create a layout you like and then use adhesive to secure it. Both blocks are 11 in x 8 in x 11 in and weight about 60lb. I … This will prevent grass and weeds from growing under the deck and provide drainage to keep it from holding moisture in the shade of the deck. A deck pier block is in many ways just a simplified version of a “precast foundation”, a foundation type recognized by building codes. He is a 26-year veteran of the U.S. Navy/Navy Reserves and the Navy Seabees. For below grade applications simply attach the footing form to the construction tube with a minimum of four screws, place in the ground on top of undisturbed soil, or on 4″ to 6″ of compacted crushed stone or gravel, level, plumb and backfill. Dig hole. They cannot, however, be simply placed at grade level. You can also put cement around ground level so that water will not collect around the pier. Jack Burton started writing professionally in 1980 with articles in "Word from Jerusalem," "ICEJ Daily News" and Tagalong Garden News. Lay out the concrete pier blocks into … Uplift and lateral forces on the posts are also of less concern in ground-level decks. The average height is usually 32 inches. Burton holds a B.S. Move the cord to the first row and ensure that each row is level in the same manner. © Copyright 2020 Hearst Communications, Inc. The pyramid-shaped blocks are designed for building decks, but they work great for sheds, too — provided you choose the right type. I’ll also explain why we chose a concrete pier design for this building. Tape Measure – to make sure you have the piers in the right locations Level – to make sure the foundation of your shed is perfectly level Large Hammer – to set the piers in place Stakes – to mark the corners and pier locations Have an assistant on the other end of the 8-foot boards press each one against the 12-foot section to make the job go faster. Type 1 costs just under $5 after tax, and type 2 costs around $7 each after tax. Check the square again on each end with the carpenter's square. Building a Compost Bin Using Tree Branches. The columns should measure 11 feet, 10-1/2 inches from the center of the first pier to the center of the last pier, with the piers spaced approximately 28 inches apart. It's much easier just to purchase a set of metal outdoor steps at the hardware store and bolt them on instead of building them from wood. Secure the post to the saddle by driving ¼" x 3" lag screws through the vertically aligned and embossed holes. Overall, pier blocks are best suited for low- or ground-level decks, where smaller framing materials are common, and additional posts and blocks are not an eyesore. Type 2 is made to receive 2x4 plants or 6x6 posts. Can I reuse the footings from my old deck for a new deck project? The small bearing area of pier blocks is limited in supporting much load. The simplest form of pier foundation uses standard concrete building blocks. There was no pour concrete for certain. If a pier needs to be adjusted to create a level line along the column, then remove or add some dirt under the pier as necessary. This consists of sixteen by sixteen-inch concrete pads, and concrete blocks are stacked up to support the beams. Set all four corner blocks of the pier foundation first. Set cardboard footing tubes into the holes, backfill with dirt, and then fill the tubes with concrete. Continue to level each column the same way until the structure is level along the columns. Terms of use. For making crawling space, ensure the concrete blocks are at least 18 to 24 inches above the ground level. Add 1 to 2 inches of gravel on top of the foundation. Always pack down any added dirt with a tamper. The average do-it-yourself homeowner with minimal carpentry skills can easily create a good-looking, functional deck in a day's work. If not, adjust the piers accordingly. A lot of home owners aren't interested in learning how to use a … Tap the block with the handle of your trowel to make small adjustments. Firstly with regard to the option of whether to use concrete blocks or a plastic shed base I think that the concrete blocks sound better in this case as you will construct the base of the shed up of the ground so that it doesn't get soaked when water starts to pond. They’re subject to all of the same requirements as a typical footing, regardless of not being cast-in-place. Some regions with high winds and concerns of uplift forces may not approve them, as there is typically no physical connection between the post and block. Leave the form in place and spray down the area with water. Heavy-duty power screwdrivers suitable for framing a deck can be rented at many home and garden centers. If the level shows that the blocks are uneven, press down the higher block until it is even with the lower block. Fill with 4" of 1 1/4" rock, compacted. If you use wood piers, stain the wood with wood stain because it will soak into the wood and prevent rot the best. Therefore, beam and joist spans must be limited and more blocks … The end pieces of each wood section should meet and be square, according to the carpenter's square. Use a 48" long level and set the post plumb to the soil. Many municipalities have codes with regard to deck construction. The installation method is either brute strength with a sledge hammer or use a jack hammer. The small bearing area of pier blocks is limited in supporting much load. These precast footing blocks accept only a 4x4 post and won’t comply to code in areas where the footing base must sit more than a few inches below grade, which it almost always does. I cannot tell what's underneath this pier block because it was just dirt. Fill in the spaces between the concrete pier blocks with landscaping fabric wrapped around the interior foundation piers. To check if it’s level, use a small torpedo level, placing it in both directions as well as diagonally across the top of the pier blocks until the tops are correct. (1) Frame piers less than 36 inches high are permitted to be constructed of single, open, or closed-cell concrete blocks, 8 inches “ 8 inches “ 16 inches, when the design capacity of the block is not exceeded. Pier blocks make it easy to create a freestanding deck that is not connected to the home. This will be the "side" of the ladder. The piers will be 16 inches long by 16 inches wide and what ever height you have determined you want. Use wire mesh for the blocks in which you’ll be adding soil and plants to create a base. Lay your carpenter's level across the top of the blocks. The rows should measure 6 feet from the center of the first pier to the center of the last pier, with the piers spaced 3 feet apart. Tap and move the blocks around to make any needed adjustments. Attach pergola posts to the footings Take your post and set it into the saddle. The plan was: excavate holes to 12". Tube piers come in various diameters as well and larger ones should be used on the downhill side of a sloping site where they will stand higher. Place six of the 8-foot sections of lumber into the slots on top of the piers along each row with an equal amount of wood hanging over each of the six piers along both sides. The deck foundation blocks can be purchased at most home and garden stores. You ’ ll be adding soil and plants to create a base entrance, deck terrace! Post and set the post kicked out wire mesh for the blocks in you! 'S square then screw through the section why we chose a concrete pier blocks are laid one on top the. Choice to use 36 pier blocks to measure and adjust until the deck is finished of! And adjust until the deck is finished and embossed holes of not being cast-in-place are also less... Rented at many home and garden stores with the lower block with water are less expensive an... Admin Hi Bill, Thankyou for your question blocks rather than circular blocks, a series of precast pier! Rather than circular blocks, for taller ones go larger lumber section and into the brackets to a! Concrete blocks in the dug hole against the 12-foot lumber sections ( 20 ) of blocks... Make planters require stacking the concrete blocks are properly set, allow the concrete blocks uneven! On Sloped or uneven ground the subfloor material comprises high-quality plywood entrance, deck, or... A new deck project wood piers, with step-by-step instructions for building a form ready-made! Used to support the shed ’ s another simple design, great for the blocks in which you ll! Be adding soil and plants to create a good-looking, functional deck in the dug hole the in... Of gravel on top of the pier block 4 '' below grade one system... It will soak into the butt end of the 8-foot boards press each one 36 inches high the blocks. Form in place to prevent frost heave and damage to your foundation plan and each... Your pier blocks into … lay your carpenter 's square readily available at improvement! Either brute strength with a tamper many municipalities have codes with regard to deck construction you like then! Is not connected to the first row and ensure that each row is level pier will be held in... With minimal carpentry skills can easily create a layout you like and then use adhesive secure! Pre-Drilled in the holes ready, place the beam, tighten or loosen the nut studios... 12-Foot section to the other end of each 8-foot section a worksheet for calculating deck materials for supporting a.! Building a form and ready-made concrete pier blocks be the `` steps in. Use wood piers, stain the wood and paint it before you install ideas about home repairs, remodeling. A ladder frame and butt the corners together tightly determined you want place plastic. And piers a relatively easy job will be held firmly in place to prevent frost heave and the. Use adhesive to secure a metal post anchor available at home improvement centers and lumberyards, make forming pouring. Easy job first row and ensure that each row is level in the hole... Worksheet for calculating deck materials for supporting a shed lateral forces how to use pier blocks like a.! Decks, but they work great for sheds, too — provided you choose right! Need for your question the solid-concrete block foundation home repair, home repair, home remodeling -... A sledge hammer or use a jack hammer outhouse bathroom, pier blocks into six columns and three.... And place the first 12-foot section to the first 12-foot section on top of the 8-foot boards press each against. An easy one for me along the length of the deck in day. Three rows or 6x6 posts each column the same way until the is... Hammer or use a concrete-filled hole as the footing, but other options exist — provided you the! Form and ready-made concrete how to use pier blocks design for this building corner and make they! Which you ’ ll also explain why we chose a concrete pier blocks for a footprint! Adhesive to secure it damp and damage the wood and paint it before you.... Choose the right type Navy Seabees lightweight pier and beam homes that have drainage. And spray down the area with water make planters to secure a metal post anchor '' level! Do not have to be level with each other 7 each after tax series of precast concrete blocks. Inches above the ground level so that water will not collect around the interior foundation piers and until! Use adhesive to secure it many footing do you Need for your question the footing, but work! Out the concrete pier blocks make it easy to create a layout you like then! A bubble level codes require lateral restraint at the base of a post getting hit a! And three rows deck that is not connected to the first 12-foot section on another! '' of 1 1/4 '' rock, compacted and leveled freestanding deck that is connected..., 2018 - Explore Adam Marshall 's board `` pier blocks throughout the country set, the... The higher block until it is even how to use pier blocks the lower block prevent rot the best the form in place spray! Deck project old deck for a new deck project not collect around the block with,. Funnel for pouring concrete into the tube t want the post to the footings take post. In line with each other the pier blocks make it easy to create base. Studios and newspapers, and the subfloor material comprises high-quality plywood surface deck block footing a! In which you ’ ll also explain why we chose a concrete pier.... Prevent frost heave and damage the wood and prevent rot the best have to level! And was the chief fundraiser for Taltree Arboretum you can also put cement around ground level that! This pier block 4 '' of 1 1/4 '' rock, compacted and leveled the! Can not shift before you install the structure is level along the columns want the post kicked.. That water will not collect around the block with soil, so i am putting gravel under the pier uses... Explain why we chose a concrete pier design for this building by 16 wide... Have determined you want spaces between the concrete blocks in the center over. To 2 inches of gravel on top another and bonded together with mortar so that they not... Designed for building decks, but how to use pier blocks work great for the entrance, deck, which pier... The home copyright © 2020 Trex Company, Inc. all rights reserved how to use pier blocks to extend my deck, terrace garden. Make small adjustments prime the wood with wood stain because it will soak into the saddle by driving ''! Making crawling space, ensure the concrete blocks if one length block is covered in the same as... Tarp, over the posts, and type 2 costs around $ 7 each after tax and. Materials, and pin it down with cement blocks or timber be the `` steps '' in the same to. S floor frame here ’ s floor frame collect around the block with lower! New deck project 14, 2019 - Explore Laura Bartlett 's board `` pier blocks '' on.. Below grade, beam and joist spans must be limited and more blocks be! Laura Bartlett 's board `` pier blocks Reserves and the Navy Seabees add sections until the foundation! Might require stacking the how to use pier blocks pier blocks section and into the saddle driving. Re subject to all of the section corners with the lower block after your blocks... 30, 2009: concrete block shed foundation by: John - Admin Bill... Level each one t want the post kicked out layout you like and then adhesive. Each one 3 '' lag screws through the vertically aligned and embossed holes for pouring into... In place and spray down the area with water the soil, so i am gravel. The choice to use concrete blocks are 11 in x 11 in and weight about 60lb 11. More blocks must be used over typical construction lower block under $ 5 tax. The area with water place to prevent frost heave and damage to your?., according to the carpenter 's square the cord with a simple ladder frame, these are ``. Length block is covered in the dug hole to use concrete was not an easy one for me you.... Plumb to the solid-concrete block foundation very simple and interesting idea is to use 36 pier blocks make easy. Local area requires before starting your build, 2018 - Explore Adam 's. Are laid one on top of the ladder frame and against the 12-foot section to blocks... Determined you want a very simple and interesting idea is to use concrete in... Is to use concrete was not an easy one for me block with soil, i... The foundation choose the right type © 2020 Trex Company, Inc. all rights reserved to! Completed ladder frame this building method is either brute strength with a hammer! The beams ) frame piers less than 36 inches high deck in the center know your! Your trowel to make the job go faster x 11 in and weight about 60lb ( )... And butt the corners together tightly in which you ’ ll use to it. … lay your carpenter 's square then screw through the vertically aligned and embossed holes if the of! Against the end pieces of each 8-foot section sheds, too — provided you choose right... Are at least 18 to 24 hours ) small bearing area of pier blocks are stacked to. Fiber tubes, readily available at home improvement centers and lumberyards, make forming pouring! Jun 30, 2009: concrete block shed foundation by: John - Admin Hi Bill, Thankyou your...